We are now onto bigger projects!
Bathroom:
I wanted to just change out the vanity for a new one, paint, and get new flooring.
Weeeellll, that has quicky evolved into a $3,000+ project! And we are not done yet.
To say the least, the bathroom has been stressful. After pulling out the vanity, and taking down some of the wall paper, we discovered mold. Everywhere. Behind the vanity. Behind the wall paper. Up in the ceiling. Then we discovered the floor was rotted out.
SO ... the entire bathroom (minus the shower + tub) had to be ripped down to the studs. This photo was even BEFORE other things were removed. At one point, there was no floor, no supports, nothing - just the basement when you looked down!

I'm happy to report that the floor has been re-structured, the walls are rebuilt, we got a new window installed, all new electrical, the fan installed PROPERLY (the whole reason for the mold mess to begin with...), and now the drywall is up and has been mudded. All that is left to do is put the texture on the walls, paint, install the flooring, and put everything back in order: toilet, vanity, plumbing hookup, and my favorite part ... DECORATING.
And then we have the other full bath to remodel ... SOMEDAY. ;-)
Moving on....
Kitchen:
I feel like the house has been a constant disaster zone for 1.5 months now. The dust from cutting all the wood.... the dust from leveling the floors and sanding, and just junk everywhere! I hate messes!
This photo of the kitchen is actually HARDLY a mess compared to what it has/had turned into! This was just from wall paper removal, when life was easy and my bank account was full, LOL!

Since the above photo, we have de-wallpapered, painted, gotten new floors, appliances, and new base. You can see the before and "almost" after photo at the bottom of this post ... it's much further along now even than in the "almost" after photo ... I need to take some new ones this week!
Dining/Living Room/Combo:
Again, messes. Everywhere. At. All. Times.
And again, this photo is OLD. See more of an update at the bottom of this post for the "almost" after.
Since "almost" after photo was taken, we've gotten the baseboard in, and also got a new leather chair + ottoman and a cute side table.
Front Entryway:
We were going to put new flooring in the front entry way of our home too (this room is not pictured anywhere). Well, little did we know, the entire structure was rotted wood. The wood was SO BAD that you could pick it up and crumble it like dried out leaves in autumn ... SERIOUSLY - how did we not fall through that!? So, I'm sure it sounds like an easy project ... just re-structuring the entryway ... well not so much folks!
The entry way was not part of the original structure. When it was built, there was no vapor barrier installed at all and no insulation. SO, being that it was pretty much exposed to all the elements, the entire structure was rotting. Under the flooring, the structure went down about 5 feet or so ... so all of that down in there had to be gutted and fixed so it was built properly. That project alone probably cost us $1,000.
Now, the floor is solid (as it very well should be, haha) and I got the walls painted yesterday. Just the floor has to be installed on Monday, and then we can add the base in there. Then that will be done!
Monday will be a very good day!
THEN, it's working on the upstairs ... which has become it's own disaster zone.
More to come on that later! :-)
The "Almost" Afters:
Can't wait to post the NEWER versions of these rooms!
And, hopefully by MONDAY, the bathroom will also be COMPLETE!