We have owned our house for 107 days.
I got this post idea from Nicole. She posted the items they have accomplished on their home over the last year, and she as well made a list of what they plan to do in the next year. I thought it would be neat to have this post to look back on, at ALL the progress we made in such a short amount of time.
The following is a list of what we have ALREADY done in this short 107 days, and what we PLAN TO DO/STILL NEED TO FINISH.
ALREADY DONE:
Kitchen (also where our laundry area lives):

- Removed wallpaper + border
- Primed + Painted
- Removed cabinets overhead the island
- Switched out all the outlet covers to brushed nickel covers
- Removed old nasty window coverings
- Ripped out the linoleum
- Ripped out the carpet
- Re-did the subfloor
- Leveled the floor
- New flooring
- Removed + replaced all the baseboard
- New storm door
- New door casing
- New washer + dryer
- New fridge
- Some new accessories + counter height table (LOVE)
- New vents
A few more pics:
Downstairs Full Bath:

- Gutted entire bathroom down to the studs (besides shower), which includes removing all the plaster + lathes
- Moved the toilet + plumbing over
- Moved the plumbing to vanity over
- Completely new floor
- Completely new ceiling
- Removed built in cabinet by shower
- Insulation + drywall
- Texturized the walls
- New window + frame + sill
- New flooring
- New vanity + faucet
- New base + casing + molding
- New accessories
- Primed + painted twice
- New bathroom fan/light + work to make it actually vent outside
- New over head vanity lighting
- New vanity mirror
- New widow treatments
- New vent
- Plus all new accessories
- Removed wall paper + border
- Repaired the damaged walls
- Removed old nasty window coverings
- Primed + painted
- New baseboard + casing
- Removed carpet
- Leveled the floors
- New wood-look laminate flooring
- Removed ugly details from fireplace
- New vents
- New accessories + furniture
Living Room:
- All the same things as the dining room
Entry Way:
- Completely removed the floor + underneath
- Re-structured entire entryway (5 feet under)
- Removed base + casing
- Primed + Painted
- New flooring
- New accessories
Stairway to 2nd Level:
- Removed plaster + lathe on side to repair damage
- New drywall on that side
- Removed carpet
- Re-structured some stairs for support
- Texturized all the walls
- New carpet
- Primed + painted
- Primed baseboard + trim around window
- Removed base + casing
- Removed carpet
- Removed top of half wall (this is where staircase comes up, sort of a stair rail...)
- Removed all plaster + lathe from half wall
- Dry walled half wall
- Texturized entire hallway
- New vents
- Primed + painted
- New carpet
- New base + casing
Each of the 3 Bedrooms:
- Removed wall paper
- Removed old nasty window coverings
- Removed carpets
- Removed base + casing + window trim
- Removed wood paneling in 1 room
- New vents
- New carpet
- New base + casing + trim
- Texturized all the walls
- Primed + painted
Upstairs Full Bathroom:
- Removed base + casing
- Primed and painted
Exterior:
- Scraped, primed, + painted 3 decks/porches + garage
- New rock bed w/wood frame around the garage
- Deleted one rock bed from middle of yard (just moved the rocks from there to around garage). See picture below:
Other:
- Actually MOVED IN!
- Hired a plumber to clean out our pipes leading to sewer
- Got a puppy (what the HELL was I thinking?)

LEFT TO DO:
Upstairs Full Bathroom:
For now:
- Finish paint details for a sharper look
- Re-finish the shower/tub (maybe just get a new one...?)
- New interior door
- New storm door (a must before winter)
- New base + molding
- New light fixture
Long Term Goal (after a year or two):
- Completely re-do the bathroom, including:
- New shower/tub
- New vanity + mirror + lighting
- Knock out built in cabinet + build exposed shelving
- New flooring
- Plus everything else that a bathroom re-model would include
Garage:
- New garage door + new steel entry door
- Update electricity out there
- Use new windows found sitting in garage and add some windows to the garage
Exterior of house:
- I'd love to get it re-painted in the next few years. It's aluminum siding and is looking a bit dingy
- Re-vamp the flower/bush beds all around the house ... just make them look cleaner, and well, better
- Shutters
- Re-finish wood on decks/porches (the part you walk on)
Kitchen:
- I'd love new countertops (Quartz...but at $60 sq/ft this will have to wait)
- New garbage disposal
- Window treatments
- (I love that this list is so short!)
Entryway:
- Finish putting on the casing + base
- New storm door
- New entry door (maybe just paint it?)
Stairs:
- Finish painting base + trim
- New top for the half wall (will be made of wood)
Hallway Upstairs:
- Finish top detail on half wall
- New doors (5 all together) + new brushed nickel door handles
- Paint Ceiling
- Paint trim between wall and ceiling
- Re-finish built in cabinet in the hallway + new hardware
- Window treatment
Downstairs Full Bath:
- Fix outlet cover
- Hang towel bar
Bedrooms:
- Window treatments
- Outlet covers
- New molding between walls and ceiling
- Paint Ceilings
- New closet doors + hardware
- Re-finish built in cabinet in 1 bedroom (+ new hardware)